Description

  • Precise removal of previous drainage system

  • Placement of two storm inlets

    • 20' deep 2x4 inlet​

    • 3' deep  2x4 inlet

  • Implementation of proper drainage system through the use of 76' of piping

    • 40' of 24" HDPE​ pipe

    • 36' of 12" HDPE pipe

  • Seamless connection of the drainage system to an 18" storm pipe

  • Hillside stabilization using 450 tons of Rip Rap reinforcing rock and stabilization fabric

  • Repaving and landscaping to return the job site to previous condition

  • Timely completion of the project within 30 days