Clairton 9th Street Stormwater Project
Clairton 9th Street Stormwater Project

Clairton 9th Street Stormwater Project
Clairton 9th Street Stormwater Project

Clairton 9th Street Stormwater Project
Clairton 9th Street Stormwater Project

Clairton 9th Street Stormwater Project
Clairton 9th Street Stormwater Project

1/7

Description

  • Precise removal of previous drainage system

  • Placement of two storm inlets

    • 20' deep 2x4 inlet​

    • 3' deep  2x4 inlet

  • Implementation of proper drainage system through the use of 76' of piping

    • 40' of 24" HDPE​ pipe

    • 36' of 12" HDPE pipe

  • Seamless connection of the drainage system to an 18" storm pipe

  • Hillside stabilization using 450 tons of Rip Rap reinforcing rock and stabilization fabric

  • Repaving and landscaping to return the job site to previous condition

  • Timely completion of the project within 30 days